The 1st and 2nd phase of the Mondego Green Park (Parque Verde do Mondego), covering an area of 13.2 hectares, were delivered by the Sociedade Coimbra Polis, to a consortium led by MRG. In Praça da Canção - corresponding to the area of the 1st phase - was made an extension to the south of the fairway and built a simple structure that allows close the premises on a show day or other events. Regarding the 2nd phase, in the area of the Nautical Club (Clube Náutico), it was built a radical park with support equipment for water sports and other sports activities, a playground and a picnic area. It was also built a river crossing connection with new pedestrian and cycling path.