MRG Constrution
CONSTRUCTION WORKS

POLIS COIMBRA

The 1st and 2nd phase of the Mondego Green Park (Parque Verde do Mondego), covering an area of 13.2 hectares, were delivered by the Sociedade Coimbra Polis, to a consortium led by MRG. In Praça da Canção - corresponding to the area of the 1st phase - was made an extension to the south of the fairway and built a simple structure that allows close the premises on a show day or other events. Regarding the 2nd phase, in the area of the Nautical Club (Clube Náutico), it was built a radical park with support equipment for water sports and other sports activities, a playground and a picnic area. It was also built a river crossing connection with new pedestrian and cycling path.